Temporary works & site · Platforms & excavations
Strutted trench: Peck apparent pressure & strut loads calculator
A braced trench with sheeting and struts at chosen levels: Peck's apparent pressure envelope (0.65KaγH for sand; soft or stiff clay forms), tributary strut loads by the hinge method and the maximum sheeting moment. Section drawn to scale.
Standard: Peck (1969) apparent earth-pressure diagrams · trench shoring practice
Open the live calculator → All temporary works & site calculators
Inputs in the worked example
The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.
| Input | Value | Unit |
|---|---|---|
| Trench depth | 5 | m |
| Trench width | 2.4 | m |
| Soil | Sand | |
| Sand φ' | 32 | ° |
| Clay cu | 50 | kPa |
| Unit weight | 18 | kN/m³ |
| Strut depths (m), comma separated | 0.6, 2.2, 3.8 | |
| Strut spacing along trench | 2 | m |
Worked example — results
| Result | Value | Unit |
|---|---|---|
| Apparent pressure (peak) | 18.0 | kPa |
| Strut at 0.6 m | 50 | kN |
| Strut at 2.2 m | 58 | kN |
| Strut at 3.8 m | 72 | kN |
| Max sheeting moment (≈ pL²/10) | 4.6 | kNm/m |
- ✓ Struts provided at ≤ 2 m vertical spacing — 1.60 m
- ✓ Soft clay basal heave check needed — n/a
Method, formulas and assumptions
- Peck apparent pressure envelopes: sand 0.65KaγH uniform; stiff clay 0.3γH trapezoid; soft clay γH(1 − 4cu/γH) ≥ 0.3γH. Strut loads by tributary heights (hinge at mid-way between struts); sheeting moment ≈ p·span²/10.
Related temporary works & site calculators
- Piling rig working platform (BRE 470) — Granular working platform thickness for a tracked piling rig on a cohesive subgrade by the BRE 470…
- Temporary cut batter: safe height (Culmann) — The critical height of a temporary cut by Culmann's planar wedge for a soil with cohesion and friction, the…
- Crawler crane lift check (radius, capacity, ground bearing) — Checks a crawler-crane lift against a load chart (radius vs rated capacity, interpolated), adds hook block…
- Mobile crane outrigger pad / crane mat — Worst outrigger load for a mobile crane slewing over a corner (crane + load share plus the load moment over…
- Spreader beam (lifting) — CHS strut, AS 4100 — A tubular spreader carrying a load from two lower slings with a two-leg upper sling to the hook. Sling…
- Lifting lug (padeye) plate check — A plate padeye with a pin hole: bearing on the plate, net-section tension across the hole, shear tear-out to…