Piling rig working platform (BRE 470) calculator

Granular working platform thickness for a tracked piling rig on a cohesive subgrade by the BRE 470 punching-shear method: track bearing pressure for the standing case (1) and the operating/extracting case (2), the subgrade capacity and the platform thickness that spreads the load. Section drawn to scale.

Standard: BRE 470 (2004) Working platforms for tracked plant · load cases 1 (γ = 1.6) and 2 (γ = 1.2) · cohesive subgrade

Open the live calculator → All temporary works & site calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Track pressure, case 1 (standing/travelling)180kPa
Track pressure, case 2 (operating)260kPa
Track width0.9m
Track length5.2m
Platform friction angle φ'45°
Platform unit weight20kN/m³
Subgrade undrained strength cu35kPa

Worked example — results

ResultValueUnit
Subgrade capacity cu·Nc·sc186kPa
Kp·tanδ5.83
Thickness required, case 10.89m
Thickness required, case 20.99m
Design thickness (≥ 0.3 m, rounded)1.00m
piling rig trackD = 1.00 mW = 0.9 mgranular platform φ' 45°subgrade cu = 35 kPaPlatform section (BRE 470)Scale 1:35 at 180 mm print width01 m
Diagram for the worked example

Method, formulas and assumptions

Related temporary works & site calculators