Temporary works & site · Cranes & lifting

Precast pile lifting & pitching moments calculator

A square precast concrete pile lifted horizontally at two points (0.207L from each end, equal hogging and sagging) and pitched from one point (0.293L from the head) to upright it under the leader. Compares the handling moments (with impact) with the cracking moment of the section.

Standard: AS 3600 Cl 8.6 cracking moment · precast pile handling practice (2-point 0.207L, 1-point pitch 0.293L) · impact factor

Open the live calculator → All temporary works & site calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Pile size (square)350mm
Pile length15m
Concrete strength at handling f'c40MPa
Impact factor1.5
Main bar yield500MPa
Main bars4
Bar diameter20mm
Cover to bar centre55mm

Worked example — results

ResultValueUnit
Self-weight w2.94kN/m
2-point lift moment (0.0214wL² × impact)21.2kNm
1-point pitch moment (0.0429wL² × impact)42.6kNm
Cracking moment Mcr (0.6√f'c)27.1kNm
Ultimate moment (one face of bars)70.9kNm
3.11 m15 mMpitch point 0.293L from headHandling: two-point lift (top), one-point pitch (bottom)Scale 1:100 at 180 mm print width02 m
Diagram for the worked example

Method, formulas and assumptions

Related temporary works & site calculators