Temporary works & site · Piling works

Driven pile: Hiley formula (set, capacity, blows per 250 mm) calculator

Relates the final set per blow to the pile resistance for a drop or hydraulic hammer: R = ηh·W·h·ηb/(s + c/2), with the blow efficiency from the hammer and pile masses and the coefficient of restitution, and temporary compression from the cushion, pile and quake. Gives the set needed for a target resistance, the blows per 250 mm and the resistance at the observed set. Drawn to scale.

Standard: Hiley dynamic formula · AS 2159-2009 Cl 7.4 (dynamic formulae, φg) · temporary compression c = cc + cp + cq

Open the live calculator → All temporary works & site calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Hammer ram mass7t
Drop height1m
Hammer efficiency ηh0.8
Pile size (square)400mm
Pile length18m
Coefficient of restitution0.4
Temporary compression: cushion4mm
Quake (ground)2.5mm
Target ultimate resistance2400kN
Observed set (last 10 blows / 10)4mm
Geotechnical reduction φg (dynamic formula)0.45

Worked example — results

ResultValueUnit
Pile mass P7.06t
Blow efficiency ηb0.578
Energy delivered ηh·W·h·ηb31.8kJ
Set required for target R5.49mm/blow
Blows per 250 mm at target46
Resistance at observed set2,614kN
Design geotechnical strength φg·R1,177kN
leader18 mdrop 1 m7 t ramPile driving — HileyScale 1:235 at 180 mm print width05 m024681001e32e33e3Set per blow (mm)Ultimate resistance (kN)targetobserved
Diagram for the worked example

Method, formulas and assumptions