Temporary works & site · Platforms & excavations

Temporary cut batter: safe height (Culmann) calculator

The critical height of a temporary cut by Culmann's planar wedge for a soil with cohesion and friction, the factor of safety for the planned depth, and the batter needed for a target factor of safety. Section to scale with the critical wedge.

Standard: Culmann planar wedge · WHS Excavation Work Code of Practice (benching/battering > 1.5 m) · FS ≥ 1.5 temporary

Open the live calculator → All temporary works & site calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Excavation depth4m
Batter angle from horizontal60°
Cohesion c'8kPa
Friction angle φ'28°
Unit weight19kN/m³
Required FS1.5

Worked example — results

ResultValueUnit
Critical height Hc8.48m
Factor of safety Hc/H2.12
Critical plane angle44.0°
Batter for FS = 1.560.0°
critical plane θ = 44.0°4 m60°Section — temporary cutScale 1:75 at 180 mm print width02 m
Diagram for the worked example

Method, formulas and assumptions

Related temporary works & site calculators