Pavements & traffic · Traffic management & parking

Lane closure: tapers, buffer, signs and queue (TTM) calculator

Single-lane closure on a multilane road. The merge and shoulder taper lengths follow from the approach speed and lane width, the longitudinal buffer from the stopping sight distance, and the advance-sign spacing and number of delineating devices are given. The remaining lanes' work-zone capacity is compared with the hourly demand; if demand exceeds capacity the queue grows at the difference, giving the queue length and worst delay over the closure.

Standard: Austroads Guide to Temporary Traffic Management (AGTTM) Part 3 concepts · AS 1742.3 · taper L = W·S²/155 (≤ 60 km/h), W·S/1.6 (≥ 70 km/h) · deterministic queueing

Open the live calculator → All pavements & traffic calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Approach (posted) speed80km/h
Work-zone speed60km/h
Lane width closed3.5m
Lanes in the direction2
Lanes closed1
Hourly demand (one direction)1300veh/h
Work-zone capacity per open lane1500veh/h/ln
Heavy vehicles8%
Duration of the closure3h
Work area length120m
Advance sign spacing (0 = guide by speed)0m

Worked example — results

ResultValueUnit
Merge taper length175m
Shoulder taper (L/3)58m
Longitudinal buffer (SSD at work-zone speed)73m
Advance warning sign spacing120m
Delineating devices (taper @ 12 m, tangents wider)23
Work-zone capacity1,442veh/h
Demand / capacity0.90
Queue at the end of the closure0 veh (0 m)
Worst delay0.0min
work areataper 175 mbuffer 73signs @ 120 m
Diagram for the worked example

Method, formulas and assumptions

Related pavements & traffic calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.