Pavements & traffic · Traffic & intersections

Roundabout entry capacity and delay calculator

Each approach enters against the circulating flow in front of it. Entry capacity follows Tanner's gap-acceptance formula with the critical gap, follow-up headway and minimum circulating headway (scaled for a second entry lane); the degree of saturation, control delay and 95th-percentile queue follow, with the level of service for an unsignalised intersection.

Standard: Tanner (1962) gap-acceptance capacity as used in Austroads Guide to Traffic Management Part 3 · HCM 2010 roundabout control delay

Open the live calculator → All pavements & traffic calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Approaches: name, entry flow (veh/h), circulating flow (veh/h), entry lanesNorth, 620, 480, 1 East, 540, 560, 1 South, 700, 390, 2 West, 380, 650, 1
Critical gap α4s
Follow-up headway β2.5s
Minimum circulating headway Δ2s
Second entry lane factor0.8
Analysis period0.25h

Worked example — results

ResultValueUnit
North: capacity 951 veh/h · x 0.65delay 13.8 s · 95th queue 5.0 veh · LOS B
East: capacity 877 veh/h · x 0.62delay 13.5 s · 95th queue 4.4 veh · LOS B
South: capacity 1,866 veh/h · x 0.38delay 5.0 s · 95th queue 1.8 veh · LOS A
West: capacity 797 veh/h · x 0.48delay 11.0 s · 95th queue 2.6 veh · LOS B
Average delay (entry-flow weighted)10.5s
Roundabout level of serviceB
North x 0.65East x 0.62South x 0.38West x 0.48circulating
Diagram for the worked example

Method, formulas and assumptions