Steel · Connections: moment & splices

Bolted moment end plate (extended, 8.8/TB) calculator

Extended end plate on a UB beam framing into a UC column flange. The flange force M*/(d − tf) goes to the two bolt rows either side of the tension flange; each row is checked as a T-stub (mode 1 plate yield, mode 2 yield with bolt prying, mode 3 bolt fracture) for both the end plate and the column flange. Bolt shear-tension interaction, flange and web welds and column web panel shear complete the check.

Standard: AS 4100-2020 Cl 9.2 bolts, Cl 9.6 welds · T-stub yield-line model (EN 1993-1-8 Cl 6.2.4) · ASI connection design guides

Open the live calculator → All steel calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Beam460UB74.6
Column310UC118
Design moment M*220kNm
Design shear V*150kN
Bolts (8.8/TB)M24
Total bolts (incl. 2 shear bolts at the bottom)10
End-plate thickness25mm
Plate fy250MPa
Plate width200mm
Bolt gauge110mm
Bolt centre to flange face50mm
Flange fillet weld leg10mm
Web fillet weld leg6mm

Worked example — results

ResultValueUnit
Flange force Ff = M*/(d − tf)497kN
Bolt φNtf / φVf (threads in)234.4 / 133.4kN
End plate T-stub: m / n / leff38.7 / 45.0 / 200mm
End plate per row F1 / F2 / F3727 / 420 / 469 kN → mode 2 (yield + prying)
Column flange per row397 kN, mode 2 (yield + prying)
Tension capacity of the two rows794kN
Bolt interaction (V/φVf)² + (N/φNtf)²0.29
Bolt bearing on plate φVb708kN
Flange weld v* / φvw1.34 / 1.66kN/mm
Web weld v* / φvw0.18 / 1.00kN/mm
Column web panel φVpz567kN
columnFf 497 kN460UB74.6M* 220 kNm
Diagram for the worked example

Method, formulas and assumptions

Related steel calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.