Site investigation · In-situ testing

SPT corrections & correlations calculator

Raw N to N60 and (N1)60 with energy, rod, borehole and overburden corrections, and common correlations, plotted with depth.

Standard: AS 1289.6.3.1 · Youd et al. (2001) · Liao & Whitman CN

Open the live calculator → All site investigation calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Depth (m), field N1.5, 6 3.0, 9 4.5, 12 6.0, 15 7.5, 18 9.0, 24 10.5, 30 12.0, 34
Hammer energy ratio ER60%
Borehole diameter factor CB1
Sampler factor CS1
su/N60 factor (clays, Stroud)5kPa
γ above water table18kN/m³
γsat below water table19.5kN/m³
Water table depth1.5m

Worked example — results

ResultValueUnit
z = 1.5 m: N → N60 → (N1)606 → 4.5 → 7.6Dr ≈ 41 %, φ′ ≈ 28°
z = 3 m: N → N60 → (N1)609 → 7.2 → 11.2Dr ≈ 49 %, φ′ ≈ 29°
z = 4.5 m: N → N60 → (N1)6012 → 10.2 → 13.7Dr ≈ 55 %, φ′ ≈ 30°
z = 6 m: N → N60 → (N1)6015 → 14.3 → 17.1Dr ≈ 61 %, φ′ ≈ 31°
z = 7.5 m: N → N60 → (N1)6018 → 17.1 → 18.7Dr ≈ 64 %, φ′ ≈ 32°
z = 9 m: N → N60 → (N1)6024 → 22.8 → 23.0Dr ≈ 71 %, φ′ ≈ 34°
z = 10.5 m: N → N60 → (N1)6030 → 30.0 → 28.3Dr ≈ 78 %, φ′ ≈ 36°
z = 12 m: N → N60 → (N1)6034 → 34.0 → 30.2Dr ≈ 81 %, φ′ ≈ 37°
05101520253035024681012N (blows)depth (m)
Diagram for the worked example

Method, formulas and assumptions

Related site investigation calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.