Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
LayoutTriangular
Pile diameter d0.7m
Spacing s1.8m
Soft clay thickness10m
Undrained strength cu20kPa
Coefficient of volume compressibility mv1m²/MN
Applied load Δp (embankment)60kPa
Stress concentration ratio n3
Sand pile φ′30°
Sand γ′ (submerged)9kN/m³
Horizontal coefficient ch2m²/yr
Time after loading6months
Treated plan area2000m²
Sand volume factor (loose → compacted)1.3

Worked example — results

ResultValueUnit
Unit-cell area Ae2.806m²
Replacement ratio as13.7%
Stress factor on clay μc0.785
Stress factor on pile μs2.354
Untreated settlement600mm
Treated settlement471mm
Composite shear strength τ (mid-depth)32.0kPa
Equivalent diameter de1.89m
Drain spacing ratio n = de/d2.70
Radial consolidation Uh100.0%
Number of piles713
Sand per pile5.00m³
Total sand3,567m³
Plan · as = 13.7 %Δp 60 kPaSettlement 600 → 471 mm
Diagram for the worked example

Method, formulas and assumptions