Grouted duct anchorage and panel joint shear friction calculator

Starter bars from a footing or slab grouted into corrugated ducts in a precast panel. The embedment must develop the bar in the grout (development length using the grout strength, confined by the duct) and transfer the force from the duct to the surrounding concrete. The horizontal joint is checked for shear friction (clamping by the bars plus the permanent compression, coefficient μ for the joint surface).

Standard: Development of a bar in grout (AS 3600 Cl 13.1.2 basic length with grout strength, k3 = 0.7 confined) · duct–concrete bond · AS 3600 Cl 8.4 shear friction across the joint

Open the live calculator → All concrete calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Bar diameter20mm
fsy500MPa
Grout strength60MPa
Duct internal diameter50mm
Panel concrete f′c40MPa
Embedment provided600mm
Bars across the joint4
Joint length (panel width)2.4m
Panel thickness200mm
Joint surfaceSmooth / grouted bed (μ = 0.6)
Design shear across the joint250kN
Permanent compression across the joint150kN

Worked example — results

ResultValueUnit
k2 = (132 − db)/1001.12
Development length in grout (k3 = 0.7)580mm
Bar force As·fsy157.1kN
Duct–concrete bond stress 0.5√f′c3.16MPa
Length to transfer from duct to concrete316mm
Required embedment580mm
Joint shear stress v*0.521MPa
Shear friction strength vuf0.973MPa
Joint capacity φVuf327kN
footingLb 600grouted duct Ø50V*
Diagram for the worked example

Method, formulas and assumptions

Related concrete calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.