Construction & estimating · Site operations
Concrete maturity (strength in place) calculator
Temperature–time factor and equivalent age from logged temperatures, and estimated in-place strength from a calibration S = a + b·log10(M).
Standard: ASTM C1074 · Nurse-Saul TTF and Arrhenius equivalent age
Open the live calculator → All construction & estimating calculators
Inputs in the worked example
The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.
| Input | Value | Unit |
|---|---|---|
| Log: interval Δt (h), mean T (°C) | 6, 22 6, 28 6, 31 6, 26 12, 20 12, 18 24, 17 | |
| Datum temperature T0 | -10 | °C |
| Activation energy Ea | 40000 | J/mol |
| Reference temperature | 20 | °C |
| Calibration a | -38 | MPa |
| Calibration b | 19 | MPa |
| Strength required to strip | 15 | MPa |
Related construction & estimating calculators
- Concrete pour planner — Number of agitator trucks, trucks needed in rotation, pour duration, finish time and cost for a concrete pour.
- Rebar cutting length and laps — Cutting length for straight, L, U or closed-link bars with bend deductions and hooks, the laps needed for…
- Aggregate and base-course tonnage — Tonnes of road base, crushed rock or sand for an area and compacted thickness, with loose volume, truck…
- Compaction production and lifts — Number of lifts, roller output and days to place and compact a fill platform.
- Excavation dewatering estimate — Inflow to a dewatered excavation treated as an equivalent large-diameter well in an unconfined aquifer, with…
- Trench shoring take-off — Panels, strut rows and struts for a strutted trench, with excavation volume and hire cost.
- Truck and loader fleet balance — Truck cycle time, trucks needed to keep the loader busy, fleet production and hours to move a volume.
- Plant fuel and CO₂ — Diesel use, cost and CO₂ for a plant fleet from rated power, load factor and specific fuel consumption.
- Scaffold take-off (modular) — Component count for a single-run modular scaffold, with tie count and hire cost.
- Concrete mix design (ACI 211.1) — Batch quantities per m³ (water, cement, coarse and fine aggregate) by the ACI absolute-volume method.
For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.