Ground engineering · Earthquake geotechnics

Liquefaction triggering (CPT) calculator

CPT-based triggering with Ic screening, clean-sand equivalent Qtn,cs, FS profile, LPI and indicative settlement.

Standard: Robertson & Wride (1998) / Robertson (2009) · NCEER rd & MSF

Open the live calculator → All ground engineering calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Depth (m), qc (MPa), fs (kPa), u2 (kPa)1, 3.0, 20, 0 2, 2.5, 18, 5 3, 3.5, 22, 10 4, 4.5, 30, 20 5, 6.0, 38, 30 6, 1.0, 40, 120 7, 7.5, 45, 50 8, 10.0, 55, 60 9, 14.0, 70, 70 10, 16.0, 80, 80
Magnitude Mw6.5
amax0.15g
Net area ratio0.8
Nkt14
γ above water table18kN/m³
γsat below water table19.5kN/m³
Water table depth1.5m

Worked example — results

ResultValueUnit
Minimum FS1.32
Liquefaction potential index LPI0.0very low
Post-liquefaction settlement (1D)15mm
z = 1 m: CSR, CRR, FS0.097, 0.111, above GWL
z = 2 m: CSR, CRR, FS0.111, 0.104, 1.36εv 0.28 %
z = 3 m: CSR, CRR, FS0.129, 0.119, 1.32εv 0.36 %
z = 4 m: CSR, CRR, FS0.140, 0.133, 1.37εv 0.33 %
z = 5 m: CSR, CRR, FS0.147, 0.153, 1.51εv 0.23 %
z = 6 m: CSR, CRR, FS0.151, 0.143, clay-like
z = 7 m: CSR, CRR, FS0.154, 0.161, 1.50εv 0.24 %
z = 8 m: CSR, CRR, FS0.156, 0.207, 1.91εv 0.03 %
z = 9 m: CSR, CRR, FS0.158, 0.323, 2.95
z = 10 m: CSR, CRR, FS0.156, 0.395, 3.66
00.20.40.60246810CSR / CRR(M)depth (m)CSRCRR0120246810factor of safety
Diagram for the worked example

Method, formulas and assumptions

Related ground engineering calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.