Analysis & loading · Wind, snow & cyclone

Snow loads with drifting at a roof step calculator

Roof snow load for alpine and sub-alpine sites. Balanced and unbalanced shape coefficients for mono- and duo-pitch roofs, and the drift against a higher roof or parapet (μw = (b1 + b2)/2h limited by γh/sg, drift length 2h), with the design line load on purlins. Enter the ground snow load sg for the site from AS/NZS 1170.3 Section 5 (depends on region and altitude).

Standard: AS/NZS 1170.3:2003 roof snow load s = μ·Ce·Ct·sg, drift at steps (shape coefficients as EN 1991-1-3)

Open the live calculator → All analysis & loading calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Ground snow load sg (site, 1/R)3kPa
Exposure coefficient Ce1
Thermal coefficient Ct1
RoofDuo-pitch (gable)
Roof pitch15°
Step / parapet height above the roof (0 = none)2m
Upper roof width (feeding the drift)15m
Lower roof width10m
Snow density γ2kN/m³
Purlin spacing1.2m

Worked example — results

ResultValueUnit
Balanced shape coefficient μ10.80
Balanced roof snow s2.40kPa
Unbalanced (duo-pitch, α ≥ 15°)1.20 / 2.40 kPa
Drift coefficient μw1.33
Drift length ls5.0m
Peak drift load at the step4.00kPa
Purlin line load at the step (ULS = Su)4.80kN/m
Purlin line load, balanced2.88kN/m
h 2 mls 5.0 msnow load profile (kPa)
Diagram for the worked example

Method, formulas and assumptions

Related analysis & loading calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.