Site investigation · Laboratory: compaction & field density

Field density: sand replacement calculator

Hole volume from calibrated sand, then bulk density, dry density and relative compaction.

Standard: AS 1289.5.3.1 · ASTM D1556

Open the live calculator → All site investigation calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Sand mass before pouring6250g
Sand mass after pouring2410g
Sand filling the cone1105g
Calibrated sand bulk density1.43t/m³
Wet soil from the hole4020g
Moisture content11.5%
Laboratory MDD2.02t/m³
Specified minimum RC98%

Worked example — results

ResultValueUnit
Sand in hole2,735g
Hole volume1,913cm³
Bulk density2.10t/m³
Dry density1.89t/m³
Relative compaction93.32%
hole V = 1,913 cm³sand cone (ρs 1.43)ρ = 2.102 t/m³ρd = 1.885 t/m³Relative compaction RC93.3 %min 98 %
Diagram for the worked example

Method, formulas and assumptions

Related site investigation calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.