Retaining & slopes · Gravity & cantilever walls
Crib wall stability (Coulomb) calculator
Treats the filled crib as a battered gravity block: Coulomb thrust on the inclined back, sliding, overturning, eccentricity and toe pressure.
Standard: Coulomb active thrust with wall batter · sliding FS ≥ 1.5 · overturning FS ≥ 2.0 · AS 4678 style checks
Open the live calculator → All retaining & slopes calculators
Inputs in the worked example
The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.
| Input | Value | Unit |
|---|---|---|
| Wall height H | 4 | m |
| Crib depth (horizontal) | 1.6 | m |
| Batter from vertical ω | 10 | ° |
| Crib + infill unit weight | 19 | kN/m³ |
| Backfill φ′ | 30 | ° |
| Backfill γ | 19 | kN/m³ |
| Surcharge | 5 | kPa |
| Base friction angle | 30 | ° |
| Allowable bearing | 200 | kPa |
Worked example — results
| Result | Value | Unit |
|---|---|---|
| Wall friction δ = 2φ′/3 | 20.00 | ° |
| Back inclination θ = −ω (leaning into fill) | -10.00 | ° |
| Coulomb Ka | 0.232 | |
| Thrust ½KaγH² + KaqH | 39.85 | kN/m |
| Horizontal component | 39.25 | kN/m |
| Vertical component | 6.92 | kN/m |
| Wall weight γc·B·H | 121.6 | kN/m |
| Weight lever about toe B/2 + (H/2)tanω | 1.15 | m |
| Thrust lever (vertical part) B + (H/3)tanω | 1.84 | m |
| Thrust height (combined) | 1.41 | m |
| Base normal force | 128.5 | kN/m |
| Resultant from toe | 0.759 | m |
| Eccentricity B/2 − x | 0.041 | m |
| Toe pressure N/B(1 + 6e/B) | 92.80 | kPa |
| Limit: B/6 | 0.267 | m |
| Check: |e| | 0.041 | m |
| Overturning FS | 2.76 | |
| Sliding FS (W + Pv)tan δb/Ph | 1.89 |
- ✓ Sliding FS ≥ 1.5
- ✓ Overturning FS ≥ 2.0
- ✓ Resultant within middle third
- ✓ Toe pressure ≤ allowable
Method, formulas and assumptions
- Wall friction δ = 2φ′/3 = 2*30/3 = 20 °
- Back inclination θ = −ω (leaning into fill) = -10 = -10 °
- Coulomb Ka = COS(RADIANS(30--10))^2/(COS(RADIANS(-10))^2*COS(RADIANS(-10+20))*(1+SQRT(SIN(RADIANS(30+20))*SIN(RADIANS(30))/(COS(RADIANS(-10+20))*COS(RADIANS(-10)))))^2) = 0.23169
- Thrust ½KaγH² + KaqH = 0.5*0.23169*19*4^2+0.23169*5*4 = 39.851 kN/m
- Horizontal component = 39.851*COS(RADIANS(20+-10)) = 39.246 kN/m
- Vertical component = 39.851*SIN(RADIANS(20+-10)) = 6.9201 kN/m
- Wall weight γc·B·H = 19*1.6*4 = 121.6 kN/m
- Weight lever about toe B/2 + (H/2)tanω = 1.6/2+4/2*TAN(RADIANS(10)) = 1.1527 m
- Thrust lever (vertical part) B + (H/3)tanω = 1.6+4/3*TAN(RADIANS(10)) = 1.8351 m
- Thrust height (combined) = (0.5*0.23169*19*4^2*4/3+0.23169*5*4*4/2)/39.851 = 1.4109 m
- Base normal force = 121.6+6.9201 = 128.52 kN/m
- Resultant from toe = (121.6*1.1527+6.9201*1.8351-39.246*1.4109)/128.52 = 0.75857 m
- Eccentricity B/2 − x = 1.6/2-0.75857 = 0.041427 m
- Toe pressure N/B(1 + 6e/B) = 128.52/1.6*(1+6*ABS(0.041427)/1.6) = 92.804 kPa
- Limit: B/6 = 1.6/6 = 0.26667 m
- Check: |e| = ABS(0.041427) = 0.041427 m
- Overturning FS = (121.6*1.1527+6.9201*1.8351)/(39.246*1.4109) = 2.7607
- Sliding FS (W + Pv)tan δb/Ph = (121.6+6.9201)*TAN(RADIANS(30))/39.246 = 1.8907
- Global (deep-seated) stability and internal crib member strength must be checked separately; batter of 1:4 to 1:6 is typical for concrete cribs.
Related retaining & slopes calculators
- Retaining wall stability — Cantilever wall: sliding, overturning, eccentricity and toe pressure.
- Cantilever retaining wall: L, inverted-T or counterfort, with reinforcement — Reinforced concrete retaining wall as an L-shape (no toe), inverted-T or counterfort wall. Stability by…
- Prefabricated (segmental block) gravity wall — Dry-stacked concrete blocks set back at each course, as in GEO5 Prefab Wall and the Redi-Rock module…
- Lateral earth pressure — Active, passive or at-rest pressure diagram with water table, surcharge and cohesion.
- Seismic earth pressure (Mononobe–Okabe) — Static and seismic active coefficients, thrusts and overturning moment on a retaining wall.
- Lateral pressure from surcharges (elastic) — Lateral pressure profile on a rigid wall from a line load (Terzaghi modified Boussinesq) and a strip load…
For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.