Site investigation · Geophysics & monitoring

Downhole seismic: interval Vs, Vs30 and site class calculator

Corrects slant travel times to vertical, computes interval shear-wave velocities, Vs30 and the site period of the soil above material with Vs ≥ 360 m/s, and suggests the AS 1170.4 site class.

Standard: ASTM D7400 · Vs30 · AS 1170.4 site period T = 4Σh/Vs

Open the live calculator → All site investigation calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Source offset from borehole2.5m
Readings: depth (m), slant arrival time (ms)1, 16.83 2, 20.01 3, 24.41 4, 29.48 5, 34.94 6, 37.72 7, 40.77 8, 43.97 9, 47.26 10, 50.62 11, 54.02 12, 57.46 13, 60.92 14, 64.40 15, 66.22 16, 68.05 17, 69.91 18, 71.77 19, 73.64 20, 75.51 21, 77.40 22, 79.28 23, 81.18 24, 83.07 25, 84.97 26, 86.87 27, 88.77 28, 90.68 29, 92.58 30, 94.49

Worked example — results

ResultValueUnit
Deepest reading30.00m
Site period 4Σh/Vs (Vs < 360)0.254s
AS 1170.4 class (indicative)Ce
Vs30 = 30/Σ(h/Vs)318.6m/s
0100200300400500051015202530Interval Vs (m/s)Depth (m)
Diagram for the worked example

Method, formulas and assumptions

Related site investigation calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.