Ground engineering · Sand piles & stone columns

Sand compaction piles for liquefaction mitigation calculator

Loose sand densified by driving sand compaction piles. At each depth the SPT N gives the relative density and void ratio; the sand pushed in at replacement ratio as reduces the void ratio e1 = e0 − as(1 + e0)·β, giving the improved N. The tool finds the replacement ratio needed to reach the target N in the worst layer, the pile spacing for a square or triangular grid, and the improved profile.

Standard: Japanese SCP densification method (Mizuno et al. 1987; JGS) · Meyerhof Dr–N relation Dr = 21√(N/(0.7 + σ′v/98)) · replacement ratio and spacing

Open the live calculator → All ground engineering calculators

Inputs in the worked example

The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.

InputValueUnit
Layers: depth (m), SPT N, fines content (%)2, 6, 8 4, 8, 10 6, 7, 12 8, 10, 6 10, 12, 5 12, 14, 5
Groundwater depth1.5m
Unit weight above / below water18kN/m³
Target SPT N after treatment20
emax0.95
emin0.55
Densification efficiency β (reduce for fines)0.9
Fines content above which SCP is unsuitable20%
Sand pile diameter0.7m
GridTriangular

Worked example — results

ResultValueUnit
Governing replacement ratio as12.8%
Pile spacing for d = 0.7 m (triangular)1.87m
z 2 m: N 6 → 20.0Dr 51 %, e0 0.746, as needed 12.8 %
z 4 m: N 8 → 23.9Dr 55 %, e0 0.732, as needed 10.2 %
z 6 m: N 7 → 22.8Dr 48 %, e0 0.759, as needed 11.0 %
z 8 m: N 10 → 32.9Dr 54 %, e0 0.734, as needed 6.5 %
z 10 m: N 12 → 38.2Dr 56 %, e0 0.726, as needed 4.7 %
z 12 m: N 14 → 42.0Dr 58 %, e0 0.719, as needed 3.2 %
010203040024681012SPT NDepth (m)targetBefore treatmentAfter SCP
Diagram for the worked example

Method, formulas and assumptions

Related ground engineering calculators

For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.