Rebar cutting length and laps calculator
Cutting length for straight, L, U or closed-link bars with bend deductions and hooks, the laps needed for long runs from stock lengths, and total mass.
Standard: Bend deductions · hooks · lap splices (AS 3600 style)
Open the live calculator → All construction & estimating calculators
Inputs in the worked example
The live calculator starts with these values; change any of them and every result, check and diagram updates instantly.
| Input | Value | Unit |
|---|---|---|
| Shape | U-bar | |
| Bar diameter | 16 | mm |
| Dimension A | 2400 | mm |
| Dimension B | 450 | mm |
| End hooks | None | |
| Number of bars | 40 | |
| Continuous run length (laps) | 28 | m |
| Number of runs | 12 | |
| Stock length | 12 | m |
| Lap = k × db | 40 |
Worked example — results
| Result | Value | Unit |
|---|---|---|
| Cutting length | 3,236 | mm |
| Mass per metre (d²/162) | 1.580 | kg/m |
| Mass per bar | 5.11 | kg |
| Lap length | 640 | mm |
| Laps per run | 2 | |
| Run length incl. laps | 29,280 | mm |
| Total mass | 759.8 | kg |
- ✓ Cut length ≤ stock length — 3,236 mm
Method, formulas and assumptions
- Bend deduction: 2d (90°), 3d (135°), 4d (180°)
- Hooks: 90° 12d, 135° 10d, 180° 4d + 2d
- Laps = ⌈(run − stock)/(stock − lap)⌉
- Check the lap length against the development-length tool for the bar's actual stress and cover
Related construction & estimating calculators
- Concrete pour planner — Number of agitator trucks, trucks needed in rotation, pour duration, finish time and cost for a concrete pour.
- Aggregate and base-course tonnage — Tonnes of road base, crushed rock or sand for an area and compacted thickness, with loose volume, truck…
- Compaction production and lifts — Number of lifts, roller output and days to place and compact a fill platform.
- Excavation dewatering estimate — Inflow to a dewatered excavation treated as an equivalent large-diameter well in an unconfined aquifer, with…
- Trench shoring take-off — Panels, strut rows and struts for a strutted trench, with excavation volume and hire cost.
- Truck and loader fleet balance — Truck cycle time, trucks needed to keep the loader busy, fleet production and hours to move a volume.
- Plant fuel and CO₂ — Diesel use, cost and CO₂ for a plant fleet from rated power, load factor and specific fuel consumption.
- Scaffold take-off (modular) — Component count for a single-run modular scaffold, with tie count and hire cost.
- Concrete maturity (strength in place) — Temperature–time factor and equivalent age from logged temperatures, and estimated in-place strength from a…
- Concrete mix design (ACI 211.1) — Batch quantities per m³ (water, cement, coarse and fine aggregate) by the ACI absolute-volume method.
For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.