BOQ builder (bill of quantities) calculator
Add line items with quantities and rates, apply preliminaries, overhead & profit, contingency and GST; export CSV or print. Saved in your browser.
Standard: Measured items + preliminaries, OH&P, contingency, GST
Open the live calculator → All construction & estimating calculators
Related construction & estimating calculators
- Labour productivity & crew cost — Man-hours, crew days, labour cost with on-costs, plant cost and unit rate for an activity.
- Cost escalation — Escalate a base estimate by a compound annual rate or by the ratio of cost indices, including…
- Cash-flow S-curve — Monthly spend and cumulative S-curve from a total budget and profile shape, with peak month.
- Earthworks cut & fill — Volumes from cross-section areas, loose and compacted volumes, truck loads and a mass-haul diagram.
- Excavation, cart-away & disposal — Excavated bank volume with batters, bulking, backfill retained, truck loads, tonnes to tip and cost.
- Asphalt & pavement — Asphalt tonnes, tack coat and base course quantities and cost.
For preliminary design and education. Check every result against the current standard and your own engineering judgement before use.